Repeat Supply of a Defined Component
Subcontract component manufacturing produces a customer-defined item to an agreed technical scope. Ordering the same part at different times requires each request to be matched with the current document. The part code, drawing revision and material specification are therefore considered together. A clear definition of the component’s assembly function and critical features also makes it easier to specify machining and inspection requirements.
| Information checked | Question to ask | Effect on the request |
|---|---|---|
| Part code | Which component is required? | Correct component selection |
| Drawing revision | Which change applies? | Production document |
| Material specification | Is the material condition unchanged? | Machining scope |
| Inspection request | Which results are required? | Inspection and delivery scope |
Revision and Order Information
Even if a drawing revision changes only one hole, its material, surface requirements and other notes need to be reviewed again. A previous purchase order number does not replace the current drawing. The order from which a change applies should be specified to avoid mixing earlier and later revisions. Using the same part code and revision in quotations and orders helps both parties work to the same scope.
- Part code, drawing name and applicable revision
- Order quantity, material responsibility and additional processes
- Critical features and requested inspection outputs
Defining Machining and Inspection Scope
A Technical File Ready for Repeat Orders
Frequently Asked Questions
Is asking for the same part as a previous order sufficient?
The previous order is useful, but the current part code, drawing revision, quantity and material specification should be confirmed. Any design change or alteration to additional processes needs to be clearly stated in the new enquiry.
Can the customer supply material for subcontract components?
Responsibility for material supply is defined within the quotation scope. If customer-supplied material is to be assessed, provide its specification, stock dimensions, quantity and any available documents. Machining allowance and suitability are reviewed against that information.
What should be supplied when a drawing revision changes?
Send the current drawing together with its revision code and the changed features. Also identify the request to which the change applies. The production document needs to be clear and unambiguous rather than relying solely on notes added to an old drawing.