What does the prototype need to establish?
| Stage | Required information or output | Decision |
|---|---|---|
| Technical preparation | Drawing revision, material and critical dimensions | Define the machining scope |
| First article | Inspection of the agreed dimensions | Readiness for customer trials |
| Functional trial | Assembly observations and customer feedback | Acceptance or drawing revision |
| Batch preparation | Approved drawing, quantity and acceptance criteria | Release the production batch |
If a different material or simplified geometry is selected for a trial, the limits of that trial must be stated. A sample that demonstrates assembly fit does not, by itself, verify operating temperature performance or behaviour under load.
First-article inspection and functional trials
- Identify the mating part and drawing revision used for assembly.
- Record the location of the issue, operating conditions and measurements where available.
- Distinguish accepted features from dimensions requiring a change.
Managing design revisions
Changes arising from a trial are consolidated into an updated drawing; verbal instructions should not leave old and new dimensions in circulation together. Changing a hole diameter may affect connection clearance, wall thickness or the distance to an adjacent surface. Related features therefore need another review with each revision. Reworking the existing prototype and making a replacement are assessed separately, and the drawing revision represented by the next sample is clearly recorded.
Batch approval and quotation requirements
Prototype and batch production questions
How many prototype parts are needed?
The quantity depends on the planned trials. One part may be sufficient for an assembly assessment; comparing different conditions or carrying out destructive tests may require additional samples. The quantity should be established against the test plan before production.
Is prototype approval sufficient to start batch production?
The features covered by approval must be clear. Acceptance of assembly fit does not mean that material, surface treatment or service-life testing has been completed. The current drawing and agreed acceptance criteria are confirmed together before the batch starts.
Does a revision require a new prototype?
The decision depends on the location of the change and the machining allowance remaining on the existing part. Some features can be reworked; changes requiring added material or affecting reference features may require a new sample. Checks are replanned for revisions that affect function.