We approach prototype production as a practical first step in assessing a part’s assembly and function. At Bilgi Dişli, drawings, agreed inspection criteria and customer feedback establish the conditions for moving into batch production.

First stage
A prototype with agreed inspection criteria
Revision control
Drawing versions and recorded changes
Batch release
An approved part and defined production scope
MANUFACTURING EXPERTISE

What does the prototype need to establish?

A prototype may be needed to assess assembly clearance, trial a connection or evaluate how moving components fit together. Defining the feature to be verified before machining helps limit unnecessary operations and revisions. Within precision and custom part manufacturing, drawing dimensions, material and surface requirements are considered together. We establish which conclusions can reasonably be drawn from a single trial part and which questions require further testing.
From prototype preparation to batch approval
StageRequired information or outputDecision
Technical preparationDrawing revision, material and critical dimensionsDefine the machining scope
First articleInspection of the agreed dimensionsReadiness for customer trials
Functional trialAssembly observations and customer feedbackAcceptance or drawing revision
Batch preparationApproved drawing, quantity and acceptance criteriaRelease the production batch

If a different material or simplified geometry is selected for a trial, the limits of that trial must be stated. A sample that demonstrates assembly fit does not, by itself, verify operating temperature performance or behaviour under load.

First-article inspection and functional trials

Features affecting function take priority on the first article: mounting holes, seating surfaces, diameters and their relative positions. Pockets or hole patterns requiring CNC vertical machining and milling are assessed in relation to the mating component. Dimensional inspection and a functional trial on the machine are separate steps. The conditions and responsibilities for application tests involving loads, cycle counts or sealing are agreed with the customer in advance.
  • Identify the mating part and drawing revision used for assembly.
  • Record the location of the issue, operating conditions and measurements where available.
  • Distinguish accepted features from dimensions requiring a change.
Checking the first article from a datum surface

A height gauge approaches the part on a surface plate, relating the checked step to the supporting datum plane.

Managing design revisions

Changes arising from a trial are consolidated into an updated drawing; verbal instructions should not leave old and new dimensions in circulation together. Changing a hole diameter may affect connection clearance, wall thickness or the distance to an adjacent surface. Related features therefore need another review with each revision. Reworking the existing prototype and making a replacement are assessed separately, and the drawing revision represented by the next sample is clearly recorded.

Batch approval and quotation requirements

Before contract machining and batch production begin, material, quantity, surface treatments and acceptance criteria must be settled alongside the approved geometry. The workholding or operation sequence used for the prototype may need to be reconsidered for the batch quantity. Include the required prototype quantity, purpose of the trial and anticipated production volume with your drawings and model when requesting a quotation. This allows first-article preparation, possible revisions and the subsequent batch to be planned as distinct stages.

Prototype and batch production questions

How many prototype parts are needed?

The quantity depends on the planned trials. One part may be sufficient for an assembly assessment; comparing different conditions or carrying out destructive tests may require additional samples. The quantity should be established against the test plan before production.

Is prototype approval sufficient to start batch production?

The features covered by approval must be clear. Acceptance of assembly fit does not mean that material, surface treatment or service-life testing has been completed. The current drawing and agreed acceptance criteria are confirmed together before the batch starts.

Does a revision require a new prototype?

The decision depends on the location of the change and the machining allowance remaining on the existing part. Some features can be reworked; changes requiring added material or affecting reference features may require a new sample. Checks are replanned for revisions that affect function.